An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DESASTRES NATURALES, BOLIVIA

  2. Region Andina Region Sub-Andina Region de Llanos

  3. MARCO JURIDICO-LEGAL • RM. Min. S y PS #127 de marzo 2000: Comité Ministerial de Desastres: DGE, DGSS y DGS. Presidido por el VM. Salud • Ley 2140 de 25 octubre 2000: De reducción de riesgos y atención de desastres: SISRADE: CONARADE conformado por: 5 ministerios: • Presidencia, Hacienda, Gobierno, Defensa y Desarrollo Sostenible. (no salud)

  4. Ley de Reduccion de Riesgos y Atención de Desastres No. 2140 • Objeto: • Reducción de riesgos y atención de desastres • Marco institucional • Atención de desastres • Principios: • Obligatoriedad e interés colectivo • Derecho a la protección

  5. Responsabilidad • Gestión descentralizada • Subsidiariedad • Planificación/inversión • Integridad • Educación • Función estatal : Idem estado

  6. MINISTERIO DE DESARROLLO SOSTENIBLE MINISTERIO DE DEFENSA PREVENSION ATENCION

  7. El Pre andino colabora con los gobiernos en la formulación de políticas de prevención y mitigación de riesgos

  8. COMITÉ NACIONAL DE SALUD • Vice Ministro de Salud • Dirección General de Salud Ambiental • Unidad de Preparativos y Respuesta en emergencias y Desastres.

  9. INCREMENTO PORCENTUAL DE PRECIPITACION PLUVIAL DEL MES DE ENERO DE 2001 (25.01.01), RESPECTO DEL PROMEDIO ESPERADO PARA EL MES (30 AÑOS), SEGÚN ESTACIONES METEOROLOGICAS SELECCIONADAS 70 58 60 49 50 39 40 36 Porcentaje (%) 28 27 30 26 23 20 10 0 CBBA ORURO LA PAZ POTOSI COBIJA SUCRE EL ALTO PUERTO SUAREZ FUENTE: Servicio Nacional de Hidrometeorología

  10. VARIACION DEL NUMERO DE FAMILIAS AFECTADAS POR INUNDACIONES ENTRE EL 20 Y 25 DE ENERO, DPTOS. LA PAZ, ORURO, BENI Y COCHABAMBA 4500 4147 4000 3500 3000 2500 N° de Familias 2000 1500 1013 953 930 1000 718 400 500 280 50 0 20-ene 25-ene 20-ene 25-ene 20-ene 25-ene 20-ene 25-ene La Paz Oruro Beni Cocha FUENTE: Servicio Nacional Defensa Civil LAMINA N° 4

  11. Afectados 4147 953

  12. MUNICIPIOS AFECTADOS 20 Municipios Afectados: • 6 IDH muy bajo • 11 IDH Bajo • 3 IDH Medio

  13. INUNDACION VIACHA Enero, 2001 FUENTE: Dirección General de Epidemiología, MSPS, Servicio Depar tamental de Salud La Paz (SEDES La Paz)

  14. VIACHA, DISTRIBUCION DEL NUMERO DE CONSULTAS MEDICAS A DAMNIFICADOS, SEGUN DIAS 24 AL 29 DE ENERO DE 2001 700 600 573 500 400 N° DE CONSULTAS 300 234 200 94 81 100 77 45 42 0 24-Ene 25-Ene 26-Ene 27-Ene 28-Ene 29-Ene TOTAL DIAS

  15. NUMERO DE CONSULTAS DE ACUERDO A EDADVIACHA 2001 Edad

  16. Afectados por Inundaciones Cochabamba, 2001

  17. INUNDACIONLa Paz, Febrero de 2001 ANTECEDENTES FECHA: MARTES 19 DE FEBRERO SUCESO: PRECIPITACION PLUVIAL 39mm X M2 CONSECUENCIA: INUNDACION EN LA CIUDAD DE LA PAZ

  18. COSTO: 10 MILLONES DE DOLARES (APROX.) FALLECIDAS: 80 PERSONAS HERIDAS: 120 DAMNIFICADAS: 90 FAMILIAS (SOLO CIUDAD)

  19. ACCIONES REALIZADAS POR EL MINISTERIO DE SALUD • SE CONSTITUYO EL COE • SE IMPLEMENTO SUMA • SE DOTO DE BOTIQUINES DE EMERGENCIA A CENTROS HOSPITALARIOS • SE IMPLEMENTARON CENTROS DE TRABAJO SOCIAL • SE ORGANIZARON 4 EQUIPOS DE SALUD MENTAL • SE COORDINO CON LA CAJA NACIONAL DE SALUD

  20. ACCIONES REALIZADAS POR EL MINISTERIO DE SALUD • SE ELABORO EL EDAN • DGSA MOVILIZO 10 MIL DOLARES • SE GESTIONO APOYO DE LA COOPERACION INTERNACIONAL • LOS CENTROS DE SALUD ATIENDEN LAS 24 HRS • SE HA IMPLEMENTADO LA VIGILANCIA EPIDEMIOLOGICA ACTIVA