1 / 4

CloudSat

CloudSat. Friday 24 July 2009. Things Accomplished. pressed onward with the integration ordered PCB’s water table design. Tasks for All. Begin documentation in force Dani permanent assembly of OctoPump Check GUI compatibility with Mac Molly finish sphere attachment

purity
Download Presentation

CloudSat

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CloudSat Friday 24 July 2009

  2. Things Accomplished • pressed onward with the integration • ordered PCB’s • water table design

  3. Tasks for All • Begin documentation in force • Dani • permanent assembly of OctoPump • Check GUI compatibility with Mac • Molly • finish sphere attachment • finish actuator holders • Dani and Molly • finalize water table design • build it • Clay and Steve • integration of the system

  4. WEDNESDAY Sphere attachment system Actuator holders water table prototype THURSDAY finish sphere guts water table design FRIDAY PCBs ordered finalize design, get materials BY MONDAY full integration of the mass balance system at least half of mechanical integration

More Related