40 likes | 207 Views
CloudSat. Friday 24 July 2009. Things Accomplished. pressed onward with the integration ordered PCB’s water table design. Tasks for All. Begin documentation in force Dani permanent assembly of OctoPump Check GUI compatibility with Mac Molly finish sphere attachment
E N D
CloudSat Friday 24 July 2009
Things Accomplished • pressed onward with the integration • ordered PCB’s • water table design
Tasks for All • Begin documentation in force • Dani • permanent assembly of OctoPump • Check GUI compatibility with Mac • Molly • finish sphere attachment • finish actuator holders • Dani and Molly • finalize water table design • build it • Clay and Steve • integration of the system
WEDNESDAY Sphere attachment system Actuator holders water table prototype THURSDAY finish sphere guts water table design FRIDAY PCBs ordered finalize design, get materials BY MONDAY full integration of the mass balance system at least half of mechanical integration