1 / 22

Recycled Water Facilities Planning Study

Recycled Water Facilities Planning Study. Technical Workshop – December 6, 2010. Foothill Municipal Water District. Overview. History Facilities Planning Study Grant Draft Paper Review Recommendations Next Steps. History. John Morris Study Bookman-Edmonston Study RMC Study

rosine
Download Presentation

Recycled Water Facilities Planning Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Recycled Water Facilities Planning Study Technical Workshop – December 6, 2010 Foothill Municipal Water District

  2. Overview • History • Facilities Planning Study Grant • Draft Paper Review • Recommendations • Next Steps

  3. History • John Morris Study • Bookman-Edmonston Study • RMC Study • Water Resources Plan

  4. Facilities Planning Study Grant • Up to $75,000 in matching funds • Draft due December 15. • Final due February 28, 2011. • Outline in grant forms.

  5. Draft Paper Review • Introduction

  6. Draft Paper Review • Study Area Characteristics • Hydrologic Features – Raymond and Verdugo Basins • Historic extractions and recharge • Water quality of groundwater and surface water • Land Use • Population Projections – Draft UWMP – Retail agencies (Please see handout) • Beneficial Uses and effluent discharges

  7. Draft Paper Review • Water Supply Characteristics and Facilities • Description of all wholesale and retail entities • Sources of water, facilities, costs, prices • Capacities of facilities and flows • Groundwater management, recharge, overdraft • Water use trends, projections (see handout) • Quality of Supplies • Sources of additional water and plans for new facilities

  8. Draft Paper Review • Wastewater Characteristics and Facilities • Description of wastewater entities • Description of facilities, flows, etc. • Water quality of effluent and seasonal fluctuations • Additional facilities needed • Source of industrial or other problems • Existing recycling • Existing rights to use of treated effluent • Wastewater flow variations

  9. Draft Paper Review • Treatment requirements • Potential uses water quality • Health related water qualities (see handouts) • Discharge requirements – no discharge other than beneficial use • RWQCB requirements – General Permit

  10. Draft Paper Review • Recycled water market • Description of assessment procedures

  11. Draft Paper Review • Project Alternative Analysis • Planning and design assumptions • Alternatives to be evaluated – By geography: • Arroyo Seco Alternatives • Verdugo Basin Alternatives • Eaton Wash Spreading Ground Alternatives

  12. Arroyo Seco Alternatives-.25 mgd * Plus purchase cost of Pasadena water - $1,500/AF

  13. Verdugo Basin Alternatives - .25 - .5 mgd * Plus purchase cost of Glendale water - $530/AF

  14. Eaton Wash Alternatives - .5 mgd * Plus purchase cost of Pasadena water - $1,500/AF ** Plus purchase cost of GRIP water - $1,000/AF

  15. Draft Paper Review • Non-recycled water alternatives • Debris basins and infiltration galleries • Pasadena spreading ponds • Devil’s Gate Dam water transfer project • Conservation • No project alternative • Groundwater impacts – • TDS: 800 mg/l • Total nitrogen: 12 mg/l • TOC: 10 mg/l • Turbidity: 0.5 NTU

  16. MWD Projections Source: MWD Draft 2010 UWMP, 10/4/2010

  17. Alternatives Present Worth

  18. Recommended Alternatives Addition of 4rth phase based on CVWD negotiations with Glendale regarding adjudication & extension of Glendale system to Deukmejian Park

  19. Recycled Water Costs * Based on an interest rate of 4.5%, 30 year financing

  20. Energy Savings

  21. Next Steps • Submit draft to SWRCB • Revise based on comments • Decide on phasing • Submit final planning study to SWRCB • Other funding • Engineering/CEQA • Construction • Operation • Continue discussing 4rth phase with Glendale

  22. Discussion

More Related