1 / 13

The CASCADE Programme From Concept to Operations

The CASCADE Programme From Concept to Operations. ASAS-TN Malmö 26-28 September 2005 Alex Wandels CASCADE Programme Manager, EUROCONTROL. European Organisation for the Safety of Air Navigation. Content. Strategic Context Objectives Scope & Benefits Approach Conclusion.

Download Presentation

The CASCADE Programme From Concept to Operations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The CASCADE ProgrammeFromConcept to Operations ASAS-TN Malmö 26-28 September 2005 Alex Wandels CASCADE Programme Manager, EUROCONTROL European Organisation for the Safety of Air Navigation

  2. Content • Strategic Context • Objectives • Scope & Benefits • Approach • Conclusion HEALTH WARNINGThe content of this presentation may be shocking to persons who have spent too much time in an ASAS-TN environment.

  3. Strategic Context Transfer of ControlClearancesMicrophone Check Downlink of Heading, Speed, Selected flight level Initial ADS-B services More CPDLC services More D-FIS services VDL2 Mode S ADS-B Receiver VDL2 LINK 2000+ Mode S EHS CASCADE • Strategic Context • Objectives • Scope • Approach Airborne Separation Trajectory negotiation Autonomous Separation Departure Clearance Digital-ATIS Oceanic Clearance Classical Radar ACARS P+S RADAR Mode S 2000> 2005 > 2010 >

  4. CASCADE Objective • Co-ordinate the implementation of • the first ADS-B applications, • more CPDLC services, • D-FIS and other services; • Making use of existing Mode S (1090 ES) and VDL2/ATN infrastructures where possible; • To improve ATC sector productivity.

  5. Scope - Stream 1 - 2008 • Ground Surveillance Applications (ADS-B-out) • In a radar environment • In a non-radar environment • On the airport surface ? • Airborne derived data ? • CPDLC, D-FIS and other Services • Automatic-CPDLC • Data link taxi • Data link operational terminal information • Pilot preferences downlink ? Marginal Investment

  6. Scope - Stream 2 – 2011 • Airborne Surveillance Applications (ADS-B-in) • Situational awareness on the surface • Airborne situational awareness • Visual separation on approach • Sequencing & Merging • CPDLC, D-FIS and other Services • Graphical Trajectory Co-ordination ? • Down stream clearance • Flight Plan Consistency Major Investment

  7. Airport ASPA-S&M ASPA-S&M ATSA-VSA ATSA-VSA ATSA-SURF Stream 1 Stream 2 D-OTIS ADS-B-APT D-TAXI

  8. En-route ATSA-AIRB ATSA-AIRB GRECOFLIPCYDSC ADS-B-ADD ADS-B-NRA AUTO-CPDLC ADS-B-RAD PPD Stream 1 Stream 2

  9. ADS-B Scope “CASCADE is package 0.5 really”? • Package 1: 12 applications, now 10 applications (merger) • CASCADE: 8 applications, so Package 0.8 • Real implementation: 1 application or Package 0.1 • CASCADE is well and truly based on Package 1 for ADS-B.

  10. Benefits • ADS-B • provides quality surveillance in a cost effective way; • provides improved situational awareness in the cockpit; • creates opportunities to delegate some ATC tasks to pilots; • can provide situational awareness to airline operations centres. • CPDLC • reduces voice communication workload; • limits the probability of misunderstandings; • provides clear readable messages in a timely and unintrusive manner to pilots and controller; • provides infrastructure of airline operations communications.

  11. Initial Approach Operational Need TechnicalFeasibility Economic Viability ECIP&Commitment Implementation Simulations& Trials Operational Scope Requirements& Standards

  12. Validation Approach Trials Characteristics: • In an environment where the need exists • Integrated in operational systems (air and ground)

  13. Conclusion CASCADE • Continues to exploit the potential of air ground data links; • Re-uses the infrastructures put in place by other programmes; • Keeps global implementation in mind. www.eurocontrol.int/cascade