1 / 26

Iowa Smart

This overview provides information on the Iowa DOT's I-80 Automated Corridors Study and SAAFIR Grant, highlighting the goals, recommendations, and benefits of these initiatives. It also includes details on the Omaha-Council Bluffs Metro TIM group and their collaboration efforts.

tsandoval
Download Presentation

Iowa Smart

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Iowa Smart Austin Yates, P.E. TSMO Engineer, District 4

  2. Overview • About Iowa DOT • I-80 Automated Corridors Study • SAAFIR Grant • Omaha-CB Metro TIM

  3. About Iowa DOT TMA YOU ARE HERE Cass

  4. About Iowa DOT

  5. About Iowa DOT YOU ARE HERE

  6. About Iowa DOT Chef Mimal

  7. Flood 2019 Déjà vu all over again Recovery Status as of June 11, 2019

  8. I-80 Automated Corridors Study • 300 miles • OCB to Quad Cities • Balance Mobility and Access • Design for Future Needs • “Right-size” I-80 • Focus on Rural

  9. I-80 Automated Corridors Study

  10. I-80 Automated Corridors Study Avoid format wars

  11. I-80 Automated Corridors Study Statewide • Incident Rates • Hours of Congestion • By DOW • By Month • By Part of Day

  12. I-80 Automated Corridors Study Sections • Bottleneck Average Time • Bottleneck Occurrences • Buffer Time Index • DOW • Incident Rates • Month • Part of Day

  13. I-80 Automated Corridors Study Recommendations • Roadway design considering AVs • Fiber and power • Limit fixed deployments like DMS

  14. SAAFIR Grant • Safe Acceleration of Automated Freight Infrastructure Readiness • INFRA Grant 2019 • INfrastructureFor Rebuilding America • Outgrowth of Multi-state Cooperative on Highway Automation Readiness (MCHAR)

  15. SAAFIR Grant MCHAR Partnership

  16. SAAFIR Grant

  17. SAAFIR Grant Why Freight? • Economic Impact • Critical Driver Shortage • Vehicle Industry Target

  18. SAAFIR Grant Goals • Consistent and improved pavement markings and signs • One data information system • Support for all types of ADS and scalability • Benefit • Improve freight mobility and safety

  19. SAAFIR Grant Funding Request INFRA Grant $200M 20% Other Fed Funds $67M 20% Match $67M Total Program $334M

  20. SAAFIR Grant Benefit/Cost Ratio Total Cost $332M Total Benefit $4.01B NPV $3.68B B/C Ratio 13.1

  21. Omaha-Council Bluffs Metro TIM • “Smart”

  22. Omaha-Council Bluffs Metro TIM TIM Group • Outgrowth of CBIS • Meet bi-monthly • Debriefs • PMs • No longer just champions • Spun off other groups

  23. Omaha-Council Bluffs Metro TIM MOU • Two States • All Levels of Govt • All Types of Responders • 35 Agencies and Depts

  24. Summary • About Iowa DOT • I-80 Automated Corridors Study • SAAFIR Grant • Omaha-CB Metro TIM

  25. Questions? Comments? Rebuttals?

More Related