1 / 6

John McNeill ece.wpi/analog

Opportunities for Analog / Mixed Signal / RF MQPs: The NECAMSID Center for Analog and Mixed Signal Design at WPI. John McNeill http://ece.wpi.edu/analog. Center Overview. Project Topics Proposed by Industry Sponsors Analog Devices, Allegro Microsystems, Skyworks Solutions

wallis
Download Presentation

John McNeill ece.wpi/analog

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Opportunities for Analog / Mixed Signal / RF MQPs: The NECAMSID Center for Analog and Mixed Signal Design at WPI John McNeill http://ece.wpi.edu/analog

  2. Center Overview • Project Topics Proposed by Industry Sponsors • Analog Devices, Allegro Microsystems, Skyworks Solutions • Meet with sponsor representatives at start, finish of MQP

  3. Autonomous Bioinstrumentation Card • Dan Moyer, Tuan Vu • Noninvasive measurement of biosignal (pulse rate) • Autonomously powered (60µA 5V solar cell)

  4. LEDs as Feedback Sensors for Displays • Cianfrocco , Lee, Renzulli • Application: Use inactiveLEDs as sensors forfeedback calibration • Closed loop PWM control of display intensity; compensate for aging effects

  5. Trimmable Bandgap Voltage Reference in CMOS • Foreman, Solitro, Wolfertz • Implemented link fuses for bandgap voltage adjustment • Bipolar devices in CMOS for bandgap reference function

  6. Recruiting Process • http://ece.wpi.edu/analog link to: • Sign up for interview time • Indicate project preference • November 2013 • Interview • January 2014 • Result of interview process • Decision timetable same as off-campus MQPs

More Related