An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Computing and Network Infrastructure for Controls CNIC Dr. Stefan Lüders IT/CO November 21th, 2005 • Cyber Threats on the Horizon • The CNIC Mandate • CNIC Tools for Control Systems & Networks • The Impact on You

  2. Incidents at CERN • “A major worm (similar to Blaster) is spreading on the Internet” • (2004/5/3: Sasser Worm) • “New Virus / Nouveau Virus” (2005/05/30: MyDoom derivatives) • “It has been confirmed that the network problems during the week-end were due to a security break-in” (2004/6/7: General network problem) • “Vulnerable systems on the CERN site have been detected…” (2005/08/16: Zotob Worm targeting W2000) • “Do not open the message from Ab-dep-tech” (2005/11/2: virus Trojan.Lodear.A infected 40 machines) Insecure computers place site at risk DAILY !

  3. Non-centrallymanaged PCs &download e d code Systems directly exposedto Internet IRC Based Hacker Networks Blaster Worm variants(Windows) Suckit Rootkits(Linux) Code Red Worm(Webservers) Change in Trend • 2004:1179 incid. • 2003: 643 • 2002: 123 • Oct. 2005: 80 • 14 systems compromised (13 Win, 1 Linux) • 1 user application compromised • 2 accounts compromised • 63 PCs with unauthorized P2P activity (7 VPN)

  4. Zombies Higher IRC Based AttackingControls Root Kits BOT nets Denial of Service Zero Day Exploits Packet Spoofing Worms Back Doors Automated Probes/Scans Disabling Audits Viruses War Dialing Hijacking Sessions Sniffers Exploiting Known Vulnerabilities Password Cracking Password Guessing Lower 1980 1985 1990 1995 2000 20052010 Cyber Threats ─ Today’s Peril Era of Modern Information Technology(“From Top-Floor to Shop-Floor”) Transition Phase (“Controls goes IT”) Intruder Knowledge /Attack Sophistication Control Systems: Era of Legacy Technology (“Security through Obscurity”) Common Standards / Interconnectivity

  5. Controls Goes IT • Controls Networks mate Business Networks • Proprietary field busses replaced by Ethernet & TCP/IP • Field devices connect to Ethernet & TCP/IP • Real time applications based on TCP/IP • VPN connections from the outside onto the Controls Network • Use of IT protocols & gadgets: • SNMP, SMTP, FTP, Telnet, HTTP (WWW), … • Wireless LAN, Notebooks, USB sticks, … • Migration to the Microsoft Windows platform • Windows not designed for Industrial / Control Systems • OPC/DCOM runs on port 135 (heavily used for RPC)

  6. Threats due to Technique • Poorly secured systems are being targeted • Worms are spreading within seconds • Unpatched systems, O/S & applications • Missing firewalls, anti-virus software or old virus signature files • Zero Day Exploits: security holes without patches • Break-ins occur before patch and/or anti-virus available • …but how to patch/update Control PCs ? • Automation Systems are without security protections • Programmable Logic Controllers (PLCs), SCADA systems,field devices, power supplies, … • Security not integrated into their designs • …but how to secure e.g. PLCs ?

  7. Threats due to People • Passwords are known to several (many?) people • No traceability, ergo no responsibility • People are increasingly the weakest link • Use of weak passwords • Infected notebooks are physically carried on site • Users download malware and open “tricked” attachments • Missing/default/weak passwords in applications • …but how to handle Operator accounts ? • …what about password rules ?

  8. 2000: Ex-Employee hacks “wirelessly” 46 times into sewage plant and spills basement of Hyatt Regency hotel. 2004: IT intervention, hardware failure and use of ISO protocol stopped SM18 magnet test stand for 24h. 2003: The “Slammer” worm disables safety monitoring system of the David-Besse nuclear power plant for 5h. 2005: DoS (70”) stopped manual control Aware or Paranoid ? 2003/08/11: W32.Blaster.Worm

  9. Risks and costs ARE significant ! CERN Assets at Risk • Equipment being affected or even destroyed • Partially very expensive, esp. in experiments & accelerators • Sometimes impossible to repair / replace • Processes being disturbed • High interconnectivity, thus very sensitive to disturbances • A cooling process PLC failure can stop the accelerator • A power controller failure can stop a (sub-)detector • Difficult to configure • Time being wasted • Downtime reduces efficiency (esp. data loss in experiments) • Time needed to re-install, re-configure, test and/or re-start • Requires many people working, possibly outside working hours

  10. CNIC Working Group • Created by the CERN Executive Board • Delegated by the CERN Controls Board • “…with a mandate to propose and enforce that the computing and network supportprovided for controls applications is appropriate” … “to deal with security issues.” • Members from all CERN controls domains and activities • Service users (LHC Experiments, AB, TS, AT, SC) • Service providers (Network, NICE, Linux, Computer Security)

  11. CNIC Policy Approval Networking: Spec’s Spec’s NICEFC: LinuxFC: Spec’s 09/2004 01/2005 07/2005 01/2006 07/2006 Approved https://edms.cern.ch/document/584092/1 Phase I: Specification I II III Awareness campaign • Define rules, policies, and management structures • Define tools for • Controls Network Configuration, Management & Maintenance • Controls PC Configuration, Management & Maintenance • Investigate technical means and propose implementation • Stimulate general security awareness

  12. Security Policy • Network Domains • Physical network segregation & logical sub-domains • Hardware Devices • Rules for use of USB, VPN, CD-ROMs, wireless access, … • Operating Systems & Applications • Centrally managed installations • Strategy for security patches • Logins & Passwords • Ensure traceability • Restriction of generic accounts • Following IT recommendations • Security Incident Reporting • Reporting and follow up • Disconnection if risk for others

  13. CNIC Policy Approval Networking: Spec’s Dev. Pilot Spec’s Dev. Pilot NICEFC: LinuxFC: Spec’s Dev. Pilot WTS: Install. Pilot 09/2004 01/2005 07/2005 01/2006 07/2006 Phase II: Implementation I II III Deployment Awareness campaign Training on policy and tools • Deployment of CNIC policy • Tools for configuration, management & maintenance • User Training (e.g. CNIC Users Group) • Installation of Windows Terminal Servers • Full separation of TN and GPN (Jan. 9th 2006)

  14. Network Segregation • Technical Network (TN) and Experiment Networks (EN) • Only operational devices • Domain Manager withtechnical responsibility • Authorization procedure fornew connections • Desktop Computing (GPN) • Development & Testing • Should be done on GPN • Network Monitoring • Statistics & Intrusion Detection

  15. Separation of the TN • Essential Services are “trusted” • DNS, NTP, Oracle, DFS, AFS, TSM, … • Dedicated AB & TS servers • Separation planned for Jan. 9th 2006 • Temporary “trusted” groups available • Solutions to reduce set must follow • What about YOUR system ? • Check & update LAN DB (http://net/register) • List all vital devices connected to the GPN • List all vital central services

  16. Long Term Adaptations • Office or Wireless Connectionto Control System: • Connection to application gateway • Open session to connect toFE, controls machines and/or PLCs • Vulnerable Devices (e.g. PLCs) : • Protected against security risks • Grouped into “Functional Sub-Domains” • Access only possible from their host system Disconnection on “Breakpoints”

  17. NiceFC and LinuxFC • User Responsibility • Groups of computers • Responsible manager(s) • User defined configuration • Centrally managed OS & SW • Add your own packages • (soon also for office PCs) • Transparent procedures • Installation scenarios • Responsibles contacted ifpatches need to be applied

  18. Central Services • Operation, Support and Maintenance • NiceFC & LinuxFC • Centralized servers (in bldg. 513): DNS, NTP, DB, DFS, AFS, … • Standard Windows Application Gateways (Windows Server 2003) • Hardware Support • Standard network equipment • Network connections (24h/day, 365d/year) • Standard (“office”) PCs • …do YOU have specific needs ?

  19. CNIC Policy Approval Networking: Spec’s Dev. Pilot Operation Spec’s Dev. Pilot Operation NICEFC: LinuxFC: Spec’s Dev. Pilot Operation WTS: Install. Pilot 09/2004 01/2005 07/2005 01/2006 07/2006 Phase III: Operation I II III Deployment Op. Awareness campaign Training on policy and tools Operation • Review of effectiveness of policy & methods • Review improvements & suggestions • Incorporate user feedback • Reduce set of “trusted” machines • Optimize security on the TN • Adapt solutions for piquet & development

  20. What do YOU have to do ? • As Hierarchical Supervisor • Make security a work objective • Ensure follow up of awareness training • As Budget Responsible • Collect requirements for security • Assure funding • As Technical Responsible • Take responsibility in your domain • Delegate implementation to system managers • Provide a list of devices and needed services

  21. What can YOU do NOW ? • Use managed systems when possible • Ensure prompt security updates: applications, patches, anti-virus, password rules, logging configured and monitored, … • Ensure security protections before connecting to a network • E.g. Firewall protection, automated patch and anti-virus updates • Use strong passwords and sufficient logging • Check that default passwords are changed on all applications • Passwords must be kept secret: beware of “Google Hacking” • Ensure traceability of access (who and from where) • Password recommendations are at http://cern.ch/security/passwords

  22. Summary • Adoption of open standards exposesCERN assets to security risks. • CNIC provides methods for mitigation.CNIC tools are ready to be applied. • Join the CNIC Users Exchange. Do you want to act BEFORE or AFTER the incident ?

  23. Questions ? • Domain Managers: • GPN: IT/CS • TN: Uwe Epting & Søren Poulsen (TS), Pierre Charrue, Alastair Bland & Nicolas de Metz-Noblat (AB & AT) • ALICE EN: Peter Chochula • ATLAS EN: Giuseppe Mornacchi • CMS EN: Martti Pimia • LHCb EN: Beat Jost • CNIC Home page: http://cern.ch/wg-cnic • CNIC TWiki: https://uimon.cern.ch/twiki/bin/viewauth/CNIC/WebHome • Security Incidents: Computer.Security@cern.ch • Computer Security Info: http://cern.ch/security