IG meeting, December 5 th , 2012, DERA premises, Copenhagen

IG meeting, December 5 th , 2012, DERA premises, Copenhagen. NWE Day Ahead Price Coupling Further clarifications on the algorithm. Ramping Constraints. The algorithm can handle following ramping constraints Line ramping: max changes on one line from one hour to the next hour

Download Presentation

IG meeting, December 5 th , 2012, DERA premises, Copenhagen

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IG meeting, December 5th, 2012, DERA premises, Copenhagen NWE Day Ahead Price Coupling Further clarifications on the algorithm

  2. RampingConstraints • The algorithm can handle following ramping constraints • Line ramping: • max changes on one line from one hour to the next hour • Cumulative flow ramping (new feature): • Limit the flow change from one hour to the next on a set of lines. • Net position ramping (implemented, not in production yet): • Limit the change in net position from one hour to the next hour

  3. Line Ramping • Ramping constraint is an instrument of system operation to maintain system security (frequency management purposes). • This sets the maximum change in DC flows (Max MW/h per interconnector) on an hour to hour basis • Daily implicit allocations are expected to utilize DC capacity more fully (due to daily price differences), thereby causing greater and more frequent hour to hour variations in flow • ENTSO-E report on handling of ramping constraints: http://www.statnett.no/Documents/Nyheter_og_media/Nyhetsarkiv/2010/Ramping%20report.pdf

  4. Minimum stable flow • The issue has been presented to ACER 21. June where it was stated that this is a difficult requirement which has been submitted to R&D investigation • It will not be implemented by PCR/NWE launch

  5. Avoidanceofcurtailment by local matching • Local Matching Constraint (LMC) is used in markets where the two following notions are considered: • Price Taking Orders (PTOs) i.e. hourly orders at minimum or maximum price; • Curtailment: defined as the situation when not every PTO can be executed; • LMC aims at limiting curtailment and imposes the following (supply LMC below; demand LMC is symmetrical): • If demand quantity is sufficient, supply PTO must be entirely executed • If demand quantity is not sufficient, supply PTO is executed as much as possible Additional information was presented to ACER 21. June

  6. Handling ofpricedifferences • The algorithm can support different price bounds on different markets.

  7. NRAs questions • For information, a set of 27 additional questions requesting further information on the algorithm has been sent to PCR PXs by Markus Hübner on 12/11. • Answers are beeing prepared.

  8. Backup slide : Ramping on Nordic DC interconnectors • Constraints on hour to hour changes of DC flows • Max 600 MW/h per interconnector (3000 MW for all Nordic interconnectors to the Continental Europe) • Ramping constraint is an instrument of system operation to maintain system security. • Evaluated to have low social costs compared to alternatives so far. • TSOs are investigating alternatives for the future: • Shorter time resolution (quarterly production plans) • Load frequency control • More efficient activation procedure of reserves • Cumulative ramping • ENTSO-E report on handling of ramping constraints: http://www.statnett.no/Documents/Nyheter_og_media/Nyhetsarkiv/2010/Ramping%20report.pdf