UCSB 4-Hybrid Thermal Test System Status

UCSB 4-Hybrid Thermal Test System Status. 21 July 2003 Sam Burke UCSB HEP Group. Progress. Flow Control Panel complete All pitch adapter antennas installed Cold Box Assembly 98% Complete Clamps and sealing yet to be done. Cold Box System. Progress.

beryl
Download Presentation

UCSB 4-Hybrid Thermal Test System Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UCSB 4-Hybrid Thermal Test System Status 21 July 2003 Sam Burke UCSB HEP Group CMS 4-Hybrid Test System Sam Burke EE

  2. Progress • Flow Control Panel complete • All pitch adapter antennas installed • Cold Box Assembly 98% Complete • Clamps and sealing yet to be done CMS 4-Hybrid Test System Sam Burke EE

  3. Cold Box System CMS 4-Hybrid Test System Sam Burke EE

  4. Progress • LabView code changes to slow control program • Water flow calibration factors • Cooling Rate study • Dry air flow a big factor (note gui) • Chiller water temperature a factor • New temperature sensor installed on cooling plate CMS 4-Hybrid Test System Sam Burke EE

  5. Cold Box System Test Runs test 2 test 3 CMS 4-Hybrid Test System Sam Burke EE

  6. Cooling Rates • TEST 2: T=50 min • 3.0 L/m air, 1.0L/m @17 min, 14g/hr 11deg C Water • TEST3: T=32 min • 0.2 L/m air, 16g/hr 11 deg C Water\ • CERN Rate: T=20 min • Cooling plate x2 more mass than CERN plate CMS 4-Hybrid Test System Sam Burke EE

  7. Future Plans • Verify Air Flow sensor calibrations • FR1001 Air 40 mL/min*volt +-3% 0-5v • FR1005 Air 0.40 L/min*volt +-3% • Start writeup of Hybrid Test Procedures CMS 4-Hybrid Test System Sam Burke EE

  8. Future Plans • Calibrate UCSB Hybrid Cold Box after sealing • CERN Box is (18+20)/25min on cooling • CERN Box is (20+18)/3min on heating • Test 4 Hybrid ARC Stand • System move into clean room CMS 4-Hybrid Test System Sam Burke EE