UCSB 4-Hybrid Thermal Test System Status. 10 June Sam Burke UCSB HEP Group. Progress. Work on system design Breakout boards ordered Sensor connectors specified and ordered Solenoid Valves received ARC PC Card Cage received. Progress. Solid State Relays Arrived
E N D
UCSB 4-Hybrid Thermal Test System Status 10 June Sam Burke UCSB HEP Group CMS 4-Hybrid Test System Sam Burke EE
Progress • Work on system design • Breakout boards ordered • Sensor connectors specified and ordered • Solenoid Valves received • ARC PC Card Cage received CMS 4-Hybrid Test System Sam Burke EE
Progress • Solid State Relays Arrived • Lab View Errors Resolved • File for digital temperature sensor addresses • File for run history required • Power Transformer Board Layout CMS 4-Hybrid Test System Sam Burke EE
Current Needs • NIM Crate from SLAC with plugins • Move BaBar Chiller in CMS Test Lab • Plumb dry air to test system CMS 4-Hybrid Test System Sam Burke EE
Future Plans • Solenoid Valve Panel Layout for shop • Complete Schematics for Analog I/O and Digital I/O Breakout Boards • Set up Temperature Sensors and verify calibration and Communication • Read unique sensor firmware addresses • Generate Digital Sensor file CMS 4-Hybrid Test System Sam Burke EE
Future Plans • Fabricate Analog I/O Breakout Board • Test Humidity Sensor against Sensirion sensor • Fabricate Power Transformer board • Reverse Engineer Peltier Relay Board from CERN CMS 4-Hybrid Test System Sam Burke EE