1 / 12

Belize Engineering Team

Belize Engineering Team. Thomas Soerens tsoerens@uark.edu; 479-575-2494. Steadfast. 08: compost toilet building monitoring camp flood 07: Water System for Steadfast Village Intake is in Billy Barquedier National Park Funded by park grant Rapid sand filters built on hillside in jungle

celina
Download Presentation

Belize Engineering Team

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Belize Engineering Team Thomas Soerens tsoerens@uark.edu; 479-575-2494

  2. Steadfast • 08: compost toilet building • monitoring • camp • flood • 07: Water System for Steadfast Village • Intake is in Billy Barquedier National Park • Funded by park grant • Rapid sand filters built on hillside in jungle • Billy Barquedier National Park • Watershed protection, water quality monitoring, and workshops

  3. Falls and swimming hole, 3rd in series of falls below water intake

  4. 2009 Project • Billy Barquedier National Park • headquarters building construction • trail repair • camp construction • Water system improvements • Steadfast Village

  5. 2008 project: compost toilet, changing room

  6. camp shelter

  7. FLOOD

  8. Billy Barquedier North Stann Creek Gra Gra Lagoon Cockscomb Basin

  9. BBNP - Erosion and trail repair

  10. N. Stann Creek Gra Gra Lagoon

  11. Dangriga tasks? Y-Not Island

More Related