An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ICE-PLAN for LS1 • Where are we?? • User requested activities • Environment induced activities • Self generated activities and their impact • Issues Ph. Gayet (EN/ICE)

  2. ICE Components in Accelerators Enterprise computers WEB server GPN LabVIEW UNICOS/JCOP WTS OWS EWS RADE/LISA FESA (BE-CO) TN SCADA Servers Local Touch panel FEC PXI PLCs Profibus WorldFIP I&0 and devices

  3. ICE Components in Experiments Enterprise computers WEB server GPN GCS/MCS UNICOS/JCOP WTS DCS/DSS EWS JCOP EN TN/EN SCADA Servers SCADA Servers OPC OPC PLCs CAN Profibus DSS ELMB CAEN/Wiener/ISEG I&0 and devices

  4. Modification of applications under ICE responsibility • Accelerators • Existing applications • Cryogenicfor acceleratorrefrigerators: control logicevolutionie : addition of sparecompressors • CIET: New instruments to deploy • Machine protection (QPS, WIC, PIC, LHC CIRCUITS) : modification and deployment of new units or new devices • Survey: New load sensors consolidation • LHC Collimator (Environmental Temperatures): 18 Collimators relocated (R2E) and possibly 10 new collimators • Post Mortem applications for Hardware commissioning • New applications • Cooling and Ventilation : New systems and revamping of existing. • EL Supervision : developement of a new supervision based on WinCC-OA • EL : new Oscilloperturbographysystems • TIM 30/30 : RP and surveymeasurments • cryocompressors Vibration monitoring system • PS kicker : Hardware and timing for systems upgrade • Experiments • Gas control systems& Cloud logicmodification and new modules attached • NA62DCS and RUN control • DSS improvment

  5. Support to applications underequipment groups responsibility • Accelerators • CIS revamping of SPS magnet interlock system • Vacuum systems for Isolde, REX ,HieIsolde, Linac4 • Cryogenics for LHC tunnel • Infrastructure • Ramses support migration to WINCC-OA • Experiments • Cryogenics for LHC experiments • Magnet control system and vacuum of experimental areas • Vacuum systems for Na62 • Detector cooling systems

  6. Environmentinducedactivities • Operating system Evolution • Windows 7/Server 2008, SLC5/6, 64-bits migration • Commercial software version follow-up • WINCC-OA (PVSS) Version 3.11 and maybe 3.12 • OPC-UA to replace OPC-DA • LabVIEW 64-bit (Linux and Windows) • Front-end software and drivers 64-bit (Linux) • NI-NETV communication library • NI-Hypervisor • NI-SCOPE + 4 scope card drivers • NI-488 (GPIB) • Siemens : TIA Portal to Replace STEP7 • BE-CO standard Follow-up • FESA 3 • CMW • JAPC - InCA • FEC upgrade

  7. ICE-SELF GENERATED ACTIVITIES • JCOP, UNICOS • Introduction of new commonfunctionalities • Introduce redundancy • WINCC-OA History in ORACLE for accelerator application • CPC-6 package • Complete redesign of the PLC/SCADA control package to face CV needs and to be ready for new clients • Brand NEW Application generator • RADE/LISA • Project generator and multiple communication channels for Labviewapplications • Templates for real-time DAQ and analysis programs • LabVIEW project generator • SVN integration • Automate compile and deploy • Integrated testing Development and validation in 2012 in order to be ready preferably before LS1

  8. First evaluation of users applications requests & migration combinedactivities Ph. Gayet (EN/ICE)

  9. ISSUES • Redundant PLC for cryogenic are not (yet?) in the planning • No failure occurrencethis and last year (SEU exepted) justifyingthe installation • Wewillincludecommissioningactivitiesin PLAN for all systemsaffected by ICE Upgrades • Commissioning and software validations will have to bedistributedduring LS1 to avoid control peakactivities in summer 2014 • We are expecting a large additional workload to support all migrations done by framework users both in accelerator and experiments • This plan will have to berevisited if the environmentalconditions change Ph. Gayet (EN/ICE)

  10. This is the LAST SLIDE of the dayHappy LS1 Ph. Gayet (EN/ICE)

  11. Exemple : WINCC-OA Reference Configuration Plan 2014 ??? Present Q1 2013 Q3 2013 W7 SLC5/6 XP SLC5 W8 SLC6 W7 SLC5/6 UNICOS x.z JCOP x.y UNICOS 6.0.0 UNICOS 6.1.0 UNICOS 5.3.0 JCOP 5.1 JCOP 5.0 JCOP 4.3.1 WINCC-OA 3.11 WINCC-OA 3.12 WINCC-OA 3.11 WINCC-OA 3.8 Not aproved Full use of New WINCC-OA Functionnalities Migration to Reference Platform