1 / 5

Update on IMT Advanced

Update on IMT Advanced. from WP8F Meeting in May 2007. Circular Letter. WP8F plans to issue a Circular Letter to external organizations for the submission of candidate Radio Interface Technologies (RITs) for IMT-Advanced radio air interface

Download Presentation

Update on IMT Advanced

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on IMT Advanced from WP8F Meeting in May 2007

  2. Circular Letter • WP8F plans to issue a Circular Letter to external organizations for the submission of candidate Radio Interface Technologies (RITs) for IMT-Advanced radio air interface • Circular Letter will be completed at its January 08 meeting • Circular Letter will consist of a Main Body and the following Annexes • Annex 1 Background on IMT-Advanced • Annex 2 Submission and evaluation process and consensus building • Annex 3 Requirements related to service capabilities • Annex 4 Requirements related to technical system performance • Annex 5 Spectrum related requirements • Annex 6 Submission guidelines & template for details of submission • Annex 7 Evaluation guidelines and test models • Annex 8 Relevant ITU-R Recommendations, Reports and others • Annex 9 IPR policy

  3. Structure of Work • WP8F structured into various Working Groups for IMT Advanced • Relevant documents related to each Annex and WG are below

  4. Technical Requirements • Technical Requirements mostly in 560R1 • Most requirements are in square brackets and have not been finalized • One more opportunity to influence requirements • WP8F meeting in January ’08 is last opportunity to influence requirements • Contributions should be sent to the Jan meeting • May be prudent to ensure that the UMB specifications are in line with the IMT Advanced requirements

  5. IMT Advanced Timeline

More Related