1 / 15

Safety in project management life-cycle

Safety in project management life-cycle. Mariantonia Zappone EN Safety Office March, 29 th 2018. Objective. Presentation of the main steps of a project life-cycle integrating safety aspects. What is a project ?. End. Start.

lbrittney
Download Presentation

Safety in project management life-cycle

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Safety in project management life-cycle Mariantonia Zappone EN Safety Office March, 29th 2018

  2. Objective Presentation of the main steps of a project life-cycle integratingsafety aspects

  3. Whatis a project? End Start • It's a temporaryendeavor undertaken to create: • Products • Services • Results To satisfy a specificneed MARKET DEMAND/BUSINESS NEED TECHNOLOGICAL IMPROVEMENT STRATEGIC OPPORTUNITY LEGAL REQUIREMENT

  4. Project management Application of: -knowledge -skills -tools -techniques Meet the project requirements/goals respecting the contraints Cost vs budget Project/Tasks duration Resources (People, equipment, material) Stakeholders satisfaction One contraint cannotbechangedwithoutaffecting the others Project goals

  5. Key Roles Key partecipants Technical experts: -Resource coordinator -Installation coordinator -Safetyofficer -Qualityofficer -Planning officer … P. Board • Identifying the applicable safetyrules • (HSE correspondant &experts – LSA) • Being editor of safety documentation • (PSO–SF ) • Support participants in matter of safety • (PSO – Risk Analysis) • Safety coordination on the worksite • (Safety Coordinator – WSCP) • Organizingsafety audit • (HSE – Inspection ; Dept – template) • Acquisition of resourses • Validategatesbetween phases • Arbitrate in case of conflict P. Manager - Organization and coordination Users • Final users • (operation, maintenance team, etc)

  6. INITIALIZE • OPERATE & MAINTAIN Project life-cycle BUILD COMMISSION DESIGN STUDY FINALIZE - Finalise the requirements - Design the solution - Implementation plan - Prototypes - Validate and Commission - Refine, ramp-up - Train of the users - Releasedoperation documentation - Define the problem - Propose few possible solutions DECOMMISSION - Apply and improve maintenance/operationalprocedure - Manufacture - Assemble - Control and Verify - Dismantling - Disposal - Defineneeds - Convertneeds in requirements - Propose one solution - Demonstrateitsfeasibility

  7. Safetydeliverable 1. Descriptive part - Purpose and motivation - Location - Main system/safetysystems - Life cycle of the project - Provision for disismantling 2. Demonstrative part - RiskAssessment - Mitigation measures SAFETY FILE • 4. Safetyrelated records • - Reports (Safety and inspection) • - Lessonlearned • - Changes/Non-Conformace(incident/accident reports) 3. Prescriptive Part Safetyprocedures to: - Operate - Maintain - Dismantle - Dispose EDMS: 1177755

  8. INITIALIZE • STUDY Safety file Descriptive part initiated Demonstrative part initiated Safety Diagnostic: -Legal compliance -PreliminaryRiskAssessment Possible safety impact of each solution identified -Hazard inventoryof the proposed solution for: -Systems Breakdown structure -Activities breakdown structure -Final project Deliverables R= MEDIUM Solution A R= LOW Solution B Solution C R= HIGH -Hazard elimination The solution with the lowest impact shallbechoosen

  9. DESIGN BUILD Descriptive expanded Demonstrativeexpanded Prescriptive initiated Safety records Descriptive expanded Demonstrativeexpanded Prescriptive initiated Safety records Safety file - Detailed description of the safetysystemsof deliverables - Mitigation measuresimplementation • - Description of the safety aspect • Operation • Maintenance • Decomissioning - SafetyTraining - Operationalprocedureimplementation • -RiskAssessment /Mitigation measure* for: • - Project deliverables • Building phase • Operational phase • Decomissioning phase • - Safetyaudit • - Accident/incident Analysis *Technical, procedural, organizational – Failure Mode EffectAnalysis FMEA

  10. COMMISSION FINALIZE • OPERATE & MAINTAIN Descriptive updated Demonstrativeupdated Prescriptive finalized Safety records Safety file • RiskAssessment update: • - System (main deliverables) • - Eventual Tests • - Operational procedure • - Safety trainings • Mitigation measuresimplementation for the commissioningactivities • Safety validation • RiskAssessment update • - System (main deliverables) • - Operational procedure • - Safety trainings • Mitigation measuresimplementation • Safetyaudit • Accident/incident analysis

  11. DECOMMISSION • DISMALTLING • DISPOSAL • SpecificRiskAssessment: • - Decomissioning phase • Legal compliance: • - Segregation of the wastes • (hazardous vs not-hazardous) • - Transportation • - Final disposal • -Procedures to develop • Accident/Incident analysis • Mitigation measures identification and implementation • Operationalprocedures • Safetytraining • Safetyaudit • Accident/incident analysis

  12. Conclusion • Safetyshallbeinclude in each phase of a project, startingfrom the beginning to the end “from the cradle to the grave” • Everyroleshouldbeinvolved Avoid «hiddenrisks!»

  13. THANK YOU!!!

  14. Documents OpenSEConceptual design report EDMS: 1289449

More Related