An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HBD HV Controland Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 03/04/2008

  2. Upgrades For Run8 | PHENIX, BNL HBD HV Control System HBD Meeting :: March 4th, 2008 QUICK UPDATE • “HBD Real-time Simulation Project” since December 7th , 2007 – making HV control crash tests in the PHENIX environment possible • Discharge Resistor changed to 10K  discharge time issue solved | now ~ 1ms • LeCroy’s attempt to self-restart after trip has been completely blocked by recovery routine on PIC18F4620/8722 Microcontroller on relay board • HV Control for experts with enhanced features, like P/T data life remote access and threshold control, in development From LeCroy 1471 To Resistor Chain Connect Relay Discharge Relay 10K HBD HV Control & Monitoring System Manuel Proissl Page 1 of 5

  3. Upgrades For Run8 | PHENIX, BNL HBD HV Control System HBD Meeting :: March 4th, 2008 Mesh / GEM Test Box QUICK UPDATE HV Server (va022) – PHENIX HBD Lab – Physics, BNL HV Client HBD Server Loop over channels Respond to users Switch HV Client hbd1.phy.bnl.gov Check / Verify Stat. [every 15sec] TS secret IP HV Client private network ROOT Interface hvdb LeCroy 1458 Mainframe CAEN SY 1527 Mainframe 8 Trip Det. P/T, etc. 8 Divider Test Box 16 ……… 14 ……… Trip Det. LC 1471 LC 1471 11 chn. Mod. 11 chn. Mod. Logically the HBD is sitting in the IR 1 module to serve HBD HV Control & Monitoring System Manuel Proissl Page 2 of 5

  4. Upgrades For Run8 | PHENIX, BNL HBD HV Control System HBD Meeting :: March 4th, 2008 QUICK UPDATE • New Lab for HV studies since February, 2008 at Physics, BNL • LeCroy 1458 w/ 1471s and CAEN SY1527 w/ (11 chn. Board) in test • Triple-GEM & Divider Test Box – runs with both MFs in parallel HBD HV Control & Monitoring System Manuel Proissl Page 3 of 5

  5. Upgrades For Run8 | PHENIX, BNL HBD HV Control System HBD Meeting :: March 4th, 2008 QUICK UPDATE • New Lab for HV studies since February, 2008 at Physics, BNL • Two high-speed HBD servers: • Automatic read-out of P/T data from hutch at PHENIX [in progress] • (so far by Bob and Jason) • HV Detector performance data accessible, etc HBD HV Control & Monitoring System Manuel Proissl Page 4 of 5

  6. Upgrades For Run8 | PHENIX, BNL HBD HV Control System HBD Meeting :: March 4th, 2008 QUICK UPDATE • New Lab for HV studies since February, 2008 at Physics, BNL • ADAM 5000E Data Acquisition system tests in session (access via OPC servers) • High Precision (~ 0.1% offset) HV Control Feedback system in development for Run9 – independent from PS (LeCroy or CAEN) • State-of-the-art high-speed system for HV Detector Simulations, Maxwell 3D, Crash Tests, etc. installed in HBD lab PHONCS8 OPC Server A 38.4Kb Ethernet CMW1 -0x98 CMW2 -0x90 -0x91 CME -0x80 HBD Heater -0x82 -0x83 TXD Fiber Interface Fiber Interface RMCS-3 RXD OPC A-4 DAQ Room Interaction Region HBD HV Control & Monitoring System Manuel Proissl Page 5 of 5