1 / 7

Balsa Wood Bridge Design

Balsa Wood Bridge Design. Group AAA Jim Bowen. Group AAA Division of Labor. Jim Bowen did all the work Bridge design, construction, testing Matlab program development Oral and written presentation writing. Group AAA - Bridge Design and Testing Methods.

jamesdkelly
Download Presentation

Balsa Wood Bridge Design

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Balsa Wood BridgeDesign Group AAA Jim Bowen

  2. Group AAA Division of Labor • Jim Bowen did all the work • Bridge design, construction, testing • Matlab program development • Oral and written presentation writing

  3. Group AAA - Bridge Design and Testing Methods • Started with the simplest 5 node trapezoidal truss • tried different member sizes and top node spacing to see how mass and strength varied • tested some 5 node trusses that used .25” x .25” members • chose .25” x .50” as member size, 14” spacing • wrote a Matlab script to see how height affected mass, strength, and profit (see figure)

  4. Bridge Design Testing

  5. Group AAA - Bridge Information • Bridge dimensions • 24.5” long, 8.5” high, 4.0” wide • Bridge “numbers” • 10 nodes (5 per truss) • 14 members • 1 member type (.25” x .50”) • Truss configuration • Warren through truss (see figure)

  6. Truss Design - Group AAA

  7. More Bridge Information • Estimates from Matlab program • Mass = 69 grams • Strength = 111 lb • Cost = 26.5 million $ • Benefit = 29.0 million $ • Profit = 2.5 million $ • Special features of group’s work • used Matlab program to test many different candidate designs Questions?

More Related